Storage & Logistics Projects

See how we utilise vast roof spaces on distribution hubs and storage warehouses to turn wasted square footage into self-funding power plants that slash daytime operating costs

National Multi Site Rollout 50kW Commercial Storage

Key Project Focus

🟨 Solar Array: High-performance Jinko Solar Tiger Neo N-Type all-black modules utilizing SMBB and Hot 2.0 technology for maximum low-light yield.

🟨 System Core: Driven by a commercial-grade Fronius UK Tauro 50kW inverter, engineered for maximum energy conversion and uptime.

🟨 Non-Penetrative Mounting: FlatFix Fusion lightweight ballasted mounting system to preserve the roof's thermal envelope and structural warranty.

🟨 Turnkey Certification: Full lifecycle management from initial line drawings and metering strategy to the final Electrical Installation Certificate (EIC).

System Specifications

🏢 National Account Delivery: Part of a coordinated multi-site rollout for a major national storage chain.

📉 G99 Grid Compliance: Complete management of DNO requirements, engineered for a maximum active power export of 150kW.

🛡️ Structural Protection: Ballasted, zero-penetration engineering designed specifically to protect modern commercial roof membranes.

⚡ Certified Engineering: Technical fault-current contributions meticulously calculated and fully certified to rigorous commercial standards.

15.50kW High-Performance Commercial Array

|

Fronius Commercial Infrastructure

|

G99 Grid Compliant Engineering (150kW Export)

|

15.50kW High-Performance Commercial Array | Fronius Commercial Infrastructure | G99 Grid Compliant Engineering (150kW Export) |

Previous
Previous

Domestic